Commissioning
Operating Manual PNOZ m1p (ETH)
20878-EN-12
22
Download modified project to the control system PNOZmulti
Load modified project from chip card
To download data via chip card, the existing configuration data must first be deleted (gener-
al reset of device).
Procedure:
} Switch off the supply voltage.
} Disconnect all the output terminals.
} Jumper OA0-I19 on the base unit.
} Switch on the supply voltage.
When the "DIAG" LED on the base unit flashes, the memory has been cleared. The project
data can now be downloaded:
} Switch off the supply voltage.
} Remove the old chip card from the chip card slot on the base unit.
} Remove the jumper from OA0-I19 on the base unit.
} Insert the chip card containing the current project into the card slot.
} Switch on the supply voltage.
Load modified project via integrated interface
Proceed as described for the initial commissioning
Connection
Supply voltage AC DC
For the safety system
(connector X7)




For the semiconductor outputs
(connector X2)
Must always be present, even if
the semiconductor outputs are not
used




Supply voltage
6.3.3
6.3.3.1
6.3.3.2
6.3.4
Vue de la page 21
1 2 ... 17 18 19 20 21 22 23 24 25 26 27 ... 39 40

Commentaires sur ces manuels

Pas de commentaire